Our Clients
Project Profiles
Projects

North Dorchester High School
Roof Replacement
Location: Hurlock, MD


PROJECT DESCRIPTION:
14,800 S.F. Total of all Roof Areas Re-Roofed

  • Complete tear-off down to gypsum roof deck over gymnasium, front lobby, and 2 wings.
  • Installed new Two (2) ply modified bitumen roof system with new metal flashings.
  • Work completed during the summer of 2006 during a limited work schedule.  Work was required to be completed before the start of school, approx. 30 calendar days to complete work.
  • Work completed for Dorchester County Public Schools.

Deer Point Condominiums Project

North Dorchester High School
The Cathedral Baltimore, MD
Virginia State Supreme Court Alexandria, VA
PPL
Allfirst Bank